St. Kitts & Nevis

R. L. Bradshaw Rehabilitation of Runway and Taxiways

Client: 
The St. Kitts and Nevis Government
Project: 
R.L. Bradshaw Rehabilitation of Runway and Taxiways
Total Cost: 
USD$7.3M
New Start Date: 
Fri, 2018-08-10 (All day)
Contract Date: 
2018-05
Completion Date: 
November 2018
Description of Works: 
The works comprise cold planing /milling approximately 126,000 square meters of asphalt from the runway and taxiway and reinstatement of existing markings. All works will be performed between 22:00hrs to 06:00hrs Monday to Saturday nights. Rehabilitation of Runway and Taxiway will involve the following: 1. Cold Planing. 2. Crack Sealing. 3. GlasGrid Fabric. 4. Laying asphalt 75 mm thick on the runway and 50 mm thick on the taxiway. The scope of works comprises the rehabilitation of the Runway, Taxiways Bravo and Charlie. The existing shoulders will not be a part of this project. Subsequent to this, Surrey Paving and Aggregate Ltd. was contracted to conduct to rehabilitate the full extent of the runway to improve the stability and safety of the runway. The current runway design is based on Boeing 767-300, which was last rehabilitated in 2005 under a major rehabilitation program. The proposed repairs will be carried out under a night-time possession. This will allow for normal daytime operations with minimum or no impact on passenger arrival and departures.
Project Photos: 

Kennedy Simmonds Highway Rehabilitation Project

Client: 
Ministry of Public Works
Project: 
Kennedy Simmonds Highway Rehabilitation Project
Total Cost: 
US$7.73M
New Start Date: 
Mon, 2015-01-05 (All day)
Completion Date: 
December 2015
Description of Works: 
The contract is a road improvement project of 14.5km, which includes Milling, base work, paving, bushing, guardrail, pipe culvert installation, road marking, drain and road cleaning.
Project Photos: 

Government of St. Christopher and Nevis - Upgrade to Cockleshell Bay Road

Client: 
Government of St. Christopher and Nevis
Project: 
Upgrade to Cockleshell Bay Road
Total Cost: 
US922,902
Contract Date: 
2013-05
Completion Date: 
August 2013
Description of Works: 
Scope of works include: - Excavation of existing roadway - Sub and base works - Laying of 8" water pipes - Earth swale - Laying of underground conduits to facilitate cabling (data and phone) - Drainage system (ADS storm water pipes) - 50mm Asphaltic concrete paving - Road marking
Project Photos: 

Pelican Bay Development

Client: 
Pelican Bay Development Co. Ltd.
Project: 
Pelican Bay Development Co. Ltd.
New Start Date: 
Wed, 2013-05-01 (All day)
Completion Date: 
2016 October
Description of Works: 
Pelican Bay Limited proposes to construct 258 beautifully appointed luxury condominium units on 6.57 acres of land in the Potato Bay area, as follows: • 38 3- and 4-Storey Condo units on beachfront land • 132 4- and 5-Storey Condos in the central portion of the property • 40 4- and 5-Storey Hillside Condos • 48 Units in the 6-storey tower on the hill slopes • 155 Parking spaces • Tennis Courts • Spa and Fitness Centre • Business centre, Lobby and Reception area • Conference Rooms • 2 Restaurant • Shops • 2 Picturesque infinity pools. The project will consist of the following phases: Phase 1 – Construction of 210 condos on the beach front, central area and hillside along with reception facilities, lobby, restaurants, tennis courts, spa, fitness centre and Infiniti pool. Phase 2 – Construction of 48 6-storey tower units on the hillside.
Project Photos: 

St. Christopher Air and Sea Ports Authority, St. Kitts

Client: 
St. Christopher Air and Sea Ports Authority, St. Kitts
Project: 
R.L. Bradshaw International Airport Expansion
Total Cost: 
US$17
Contract Date: 
2005-11
Completion Date: 
Dec 2006
Reference: 
R.L. Bradshaw International Airport Expansion Project
Description of Works: 
Expand airport apron resurface and extend runway and construct new taxiway 
Project Photos: 

Nevis Housing and Land Development

Client: 
Nevis Housing and Land Development Corporation
Project: 
Construction of Roads at Pinneys Industrial Estate - US$1.53M and Nugent Heights - US$1.6M
Total Cost: 
US$3.1
Contract Date: 
2008-05
Completion Date: 
Dec 2008
Reference: 
Eustace Nesbeth Nevis Housing and Land Development 
Description of Works: 
Housing development including water main
Project Photos: